Modular Building Construction

SPONSORED: Intellectual Ventures and CollinsWoerman partner on a new modular building technique that has: 50% reduction in time to design and build, construction cost 20% lower in comparable buildings, reduce operating and maintenance costs by 20%, eliminates 75% of field construction labor, reduce energy and water by 50%.

http://www.intellectualventures.com/

http://www.collinswoerman.com/

Be first to comment